What to pay attention to when spraying
Catalogue:Industry informationClick rate:Time:2017-08-26 11:09:01
Source of the article:Responsible editor:
Safety technical measures for spraying operation
1. Spraying operators must undergo safety technical training, and are not allowed to work without training.
2. Before painting, all painting equipment and tools must be fully inspected, and work can only be done when there is no problem.
3. The ventilation and purification of the painting workplace shall meet the requirements of GB 6415.
4. During the operation, the safety technology department of the enterprise should set up special personnel to regularly measure the oxygen content and combustible gas concentration in the air in the confined space. The oxygen content should be above 18%, and the combustible gas concentration should be lower than 10% of the lower explosion limit.
5. At least two people are required to work together for painting in the cabin. If the workplace is too small and can only accommodate one person to operate, another person should be responsible for supervision.
6. The painting operation at heights shall comply with the "Safety Regulations for Ship Construction at Heights".
7. When multiple spray guns work at the same time, the distance must be widened (about 5m), and the spraying shall be carried out in a certain and the same direction.
8. For special coating operations, the spraying equipment and hoses should be managed by special personnel. If the equipment fails or has abnormal conditions, first notify the personnel in the cabin to withdraw from the cabin, and the maintenance personnel will overhaul.
9. The high-pressure jet and leakage of airless paint can lead to serious injury accidents. When working, you should do the following:
a. Do not point the nozzle of the spray gun at others and yourself at any time;
b. Do not touch the nozzle with your fingers, or peer into the muzzle;
c. When cleaning the spray gun, cut off the pump driving source, release the pressure, and make the safety device sell to the spray gun before cleaning;
d. When the gun is out of use, the safety latch must be locked.
10. After the work is completed, the spray gun must be withdrawn from the cabin in time, and ventilation should be continued until the paint film is completely cured.
11. After the painting operation is completed, the workplace should be cleaned up in time, and the remaining paint and solvent should be returned to the warehouse in time, and are not allowed to be placed indiscriminately.
12. Operators must wear protective masks, rubber gloves, eye masks and other related protective equipment.
1. Spraying operators must undergo safety technical training, and are not allowed to work without training.
2. Before painting, all painting equipment and tools must be fully inspected, and work can only be done when there is no problem.
3. The ventilation and purification of the painting workplace shall meet the requirements of GB 6415.
4. During the operation, the safety technology department of the enterprise should set up special personnel to regularly measure the oxygen content and combustible gas concentration in the air in the confined space. The oxygen content should be above 18%, and the combustible gas concentration should be lower than 10% of the lower explosion limit.
5. At least two people are required to work together for painting in the cabin. If the workplace is too small and can only accommodate one person to operate, another person should be responsible for supervision.
6. The painting operation at heights shall comply with the "Safety Regulations for Ship Construction at Heights".
7. When multiple spray guns work at the same time, the distance must be widened (about 5m), and the spraying shall be carried out in a certain and the same direction.
8. For special coating operations, the spraying equipment and hoses should be managed by special personnel. If the equipment fails or has abnormal conditions, first notify the personnel in the cabin to withdraw from the cabin, and the maintenance personnel will overhaul.
9. The high-pressure jet and leakage of airless paint can lead to serious injury accidents. When working, you should do the following:
a. Do not point the nozzle of the spray gun at others and yourself at any time;
b. Do not touch the nozzle with your fingers, or peer into the muzzle;
c. When cleaning the spray gun, cut off the pump driving source, release the pressure, and make the safety device sell to the spray gun before cleaning;
d. When the gun is out of use, the safety latch must be locked.
10. After the work is completed, the spray gun must be withdrawn from the cabin in time, and ventilation should be continued until the paint film is completely cured.
11. After the painting operation is completed, the workplace should be cleaned up in time, and the remaining paint and solvent should be returned to the warehouse in time, and are not allowed to be placed indiscriminately.
12. Operators must wear protective masks, rubber gloves, eye masks and other related protective equipment.
Relevant information
- How to desulfurize waste liquid in infrared tu....
- Cleaning method of energy-saving tunnel furnace
- Industrial oven temperature problems
- What are the main reasons for the increase in ....
- Air transport mode of high temperature tunnel ....
- Manufacturing standards for industrial ovens
- Tunnel furnace characteristics and shipping
- The heating principle of high temperature oven
- How to sterilize infrared tunnel furnace at hi....
- How can I check the function of a high tempera....

Dongguan ChuangMeng Mechanical Equipment Co., Ltd. © Copyright 2017 粤ICP备17135927号
Telephone:0769-81031085 Fax:0769-81031085
Email:Lin@gdchuangmeng.com Add:Dongguan ChuangMeng Mechanical Equipment Co., Ltd., building 1, No. 1, Huangnitang Industrial Road, Changping Town, Dongguan
Technical support:Dongguan website construction