Hello, welcome to the official website!

Dongguan ChuangMeng Mechanical Equipment Co., Ltd.

Improve production efficiency and reduce labor costSpecializing in the production of dust-free spraying equipment / drying equipment / all kinds of non-standard machinery

24-hour hotline:139 2923 1092(Wechat)
  • Infrared tunnel furnace - tunnel drying furnace - high temperature industrial oven - Dongguan ChuangMeng Mechanical Equipment Co., Ltd.
  • Infrared tunnel furnace - tunnel drying furnace - high temperature industrial oven - Dongguan ChuangMeng Mechanical Equipment Co., Ltd.
Hot Keywords:  Synthetic Cutting Oil  pressure oil

news

products

contact us

Dongguan Chuangmeng Machinery Equipment Co., Ltd.
Contact: Lin Liangguo
Mobile: 13929231092
Tel: 0769-81031085
Fax: 0769-81031085
Website: www.dgchuangmeng.net
Email: lin@gdchuangmeng.com
Address: Building 1, No. 1, Huangnitang Industrial Road, Changping Town, Dongguan City



Summarize the placement and management of assembly line rollers

Catalogue:Industry informationClick rate:Time:2020-08-11 09:26:31

Source of the article:Responsible editor:

The installation and management of the assembly line drum should take into account the later modernization treatment in advance. The two complement each other and can become the most reasonable modern treatment equipment. First of all, the overall arrangement of the assembly line should be careful, otherwise, the planned products, valuable equipment and excellent sales will all be sacrificed to the installation of low-quality equipment lines. Assembly line installation should be combined with modern processing, and how to process it should be considered. Some advanced treatment methods are directly related to assembly line installation.

  1. Equipment selection

The selection of    automatic assembly line equipment is determined according to the technical requirements of the product and the process method of the device. The correct selection of the process equipment and tooling for the installation line can not only improve the production efficiency, reduce the manufacturing cost, but also rationalize the installation process of the installation line. Issues to be considered when selecting assembly line equipment include: product production outline; product quality requirements; advanced equipment; equipment reliability; equipment price;

  2. Product structure

  The product structure and installation process planning of the assembly line roller are the primary considerations in the installation of the assembly line. Analyzing and discussing the product structure, and putting forward suggestions for improving the product structure, can greatly simplify the production process of the device line.

  3. Production method of assembly line

The production method of the assembly line roller is an aspect that needs to be considered when the assembly line is set up. The following points should be clear when determining the production method: the production outline; the operation principle, here refers to the operation shift and the operation time of each shift; the production line type, it is necessary to consider whether to choose an automatic line or an assembly line Production, whether it is a single machine production or a group production; the treatment method refers to the treatment method, principles and rules to ensure the rules of the production station.

  4. Equipment line logistics and delivery

  Material activities are completed by shipping. Material transportation is essential in the factory, and we should choose an economical and reasonable transportation method. It can be concluded that the amount of material movement depends on its production factors. It is necessary to ensure that the transportation distance of the material flow is short in the installation of the installation line, and it will continue to flow to the end of the product installation line, and establish a control system to ensure the material flow Activity.

  5. Storage and auxiliary equipment

  The material flow has been flowing to the end of the device process, but no matter when, as long as the material is stopped, there will be a shutdown waiting for material. Therefore, it is necessary to maintain a certain amount of storage to ensure the movement of material flow on the device line, which is economical and reasonable in terms of maintaining production and balancing process capacity. In addition, auxiliary equipment also plays an important role in providing maintenance and services for production.

The installation and management of the above assembly line rollers are introduced here. The assembly line fully reflects the cooperation ability between people and machinery, making the machinery and equipment more flexible. Meet the shipping requirements of a variety of products.

Infrared tunnel furnace - tunnel drying furnace - high temperature industrial oven - Dongguan ChuangMeng Mechanical Equipment Co., Ltd.

Dongguan ChuangMeng Mechanical Equipment Co., Ltd.   © Copyright 2017 粤ICP备17135927号
Telephone:0769-81031085  Fax:0769-81031085
Email:Lin@gdchuangmeng.com  Add:Dongguan ChuangMeng Mechanical Equipment Co., Ltd., building 1, No. 1, Huangnitang Industrial Road, Changping Town, Dongguan
Technical support:Dongguan website construction

WeChat

Consultation hotline:

139 2923 1092(Wechat)
Online Service